The first two white goods (fridge and washing machine) will be delivered on Saturday too! Now to plan for house warming. Probably on 1 Sep 2013!
After almost 3 months, our new home renovation is almost complete. Add the toilet fixtures and a second coat of paint and we can start moving in this Saturday!
The first two white goods (fridge and washing machine) will be delivered on Saturday too! Now to plan for house warming. Probably on 1 Sep 2013!
0 Comments
Leave a Reply. |
About MeJust your typical guy in his 40s, married to a lovely wife + three kids, living a life in tiny Singapore. Categories
All
Class 2B Summary
Circuit Orientation: 1 Lesson 1: 2 Lesson 2: 1 Lesson 3: 1 Lesson 4: 1 Lesson 5: 3 Lesson 6: 2 Lesson 7: 1 Lesson 8: 1 Circuit Revision: 8 Road Revision: 4 Basic Theory: N/A Riding Theory: 4/4 Defence Riding Theory: 3/3 Internal Evaluation: 1 Riding Theory Test: 1/1 Final Practical Test: 1/1 Amount Spent $140+$300+200+200+150 Class 2A Summary Lesson 1: 1/1 Lesson 2: 1/1 Lesson 3: 1/1 Riding Theory: 1/1 Circuit Revision: 2 Final Practical Test: 1/1 Amount Spent $330 Class 2 Summary Lesson 1: 1/1 Lesson 2: 1/1 Lesson 3: 1/1 Circuit Revision 2/2 No show: 2/2 Final Practical Test: 1/1 Amount Spent $400 Total [2B+2A+2]: $1720 Archives
April 2023
|